Label Paper Permanent Critical Pathway 2 1/4"x7/8" Fl. Green 1000 per Roll

Part #
59704589
LABEL PAPER PERMANENT CRITICAL PATHWAY 2 1/4" X 7/8" FL. GREEN 1000 PER ROLL
Log in for contract pricing
$47.14
Label Paper Permanent Critical Pathway 2 1/4"x7/8" Fl. Green 1000 per Roll is available to buy in increments of 1
Label Paper Permanent Critical Pathway  2 1/4"x7/8" Fl. Green 1000 per Roll
Label Paper Permanent Critical Pathway  2 1/4"x7/8" Fl. Green 1000 per Roll
LABEL PAPER PERMANENT CRITICAL PATHWAY 2 1/4" X 7/8" FL. GREEN 1000 PER ROLL
More Information
Units 1000
Material Paper
Width 2-1/4
Color Fluorescent Green
Unit of Measurement Roll
Wound Side First/Right-handed person/Outside
Size 2-1/4" W x 7/8" H
© 2023 PDC Healthcare. All Rights Reserved.